Calculated result
Ready-mix order
CONC-SLAB-001L × W × D × quantity ÷ 27 × (1 + waste) → ready-mix order
Net volume
Net volume
10 yd³ truck-load equivalent
17 tested tools in concrete
Plan slab volume, rebar grids, sonotube piers, ready-mix orders, bag counts and concrete weight with waste, rounding and planning limits left visible.
Concrete calculator
Volume, ready-mix order, and bag equivalent for a rectangle, circle, or L-shape.
By Feroz Sheikh · Our math isn't hidden: see the formula, waste allowance and rounding rule.
See the formula, waste and rounding.
CONC-SLAB-001v1.2.0Enter your measurements. Switching units converts the same project, including coverage and unit rates. Package yields keep the unit printed beside each field.
Calculated result
Ready-mix order
CONC-SLAB-001L × W × D × quantity ÷ 27 × (1 + waste) → ready-mix order
Net volume
Net volume
10 yd³ truck-load equivalent
Planning estimate, not engineering advice. Confirm site measurements and product specifications. Calculation limits.
Counts round up. A cubic yard is 45 of 80 lb, 60 of 60 lb, 72 of 50 lb, 90 of 40 lb.
| Bag | Count |
|---|---|
| 40 lb | 288 |
| 50 lb | 231 |
| 60 lb | 192 |
| 80 lb | 144 |

This calculator returns ready-mix order quantity and bag equivalents for a rectangle, circle, or L-shape slab, in metric or imperial units. Formula CONC-SLAB-001 v1.2.0. Waste and purchase rounding stay on the sheet. Drop the line into an estimate and send a quote letter.
Enter supplier prices and any labour, equipment or delivery costs. Pick a currency — badges, inputs, and totals follow.
Enter your supplier’s ready-mix concrete rate in the selected unit. Add delivery, pumping, short-load fees and placing labour as separate project costs. For GCC projects, select QAR, AED, SAR, KWD, OMR or BHD and enter local supplier rates.
Formula-first tool library
Rebar mass per metre, per bar and for a stated bar count from nominal diameter and steel density.
Open calculatorVolume, ready-mix order, and bag equivalent for a rectangle, circle, or L-shape.
Open calculatorContinuous footing volume, ready-mix quantity, and whole-bag equivalent.
Open calculatorConcrete wall volume with stated thickness, waste, and ready-mix rounding.
Open calculatorRound concrete-column volume, ready-mix order and bag-equivalent estimate.
Open calculatorDriveway volume, ready-mix order and bag-equivalent estimate with visible allowance.
Open calculatorPatio slab volume, ready-mix order and bag-equivalent estimate with visible allowance.
Open calculatorSlab volume translated into a whole-bag purchase quantity using the stated bag yield.
Open calculatorPreliminary material cost from a stated ready-mix quantity and local supplier rate.
Open calculatorPreliminary slab rebar count, linear footage and bar-weight planning from spacing, cover and bar size.
Open calculatorConcrete volume and bag count for round fence or deck post holes, including solid sonotube piers when post diameter is zero.
Open calculatorVolumetric cement, sand and aggregate split from a known wet volume using a stated mix ratio and dry-volume factor.
Open calculatorTriangular-step volume, ready-mix order and bag equivalent from riser, tread, width and count.
Open calculatorCombined curb-and-gutter volume, ready-mix order and bag equivalent from run length and the two cross-section rectangles.
Open calculatorWelded-wire mesh sheet count from slab area and the face coverage of one sheet, with overlap sitting in the waste field.
Open calculatorConcrete tons from a stated volume and an editable density. Ready-mix yards stay the slab tool.
Open calculatorSolid cardboard-tube volume, ready-mix order and bags. Post-hole annulus is a different tool when a post occupies the hole.
Open calculatorThese are transparent planning aids, not engineering, code, installation or final supplier specifications. Confirm actual job requirements before construction.