Calculated result
Ready-mix order
CONC-SONO-001π × (diameter ÷ 2)² × height × count ÷ 27 × (1 + waste) → ready-mix order
Net volume
Concrete calculator
Sonotube calculator publishes formula CONC-SONO-001 version 1.0.0.
By Feroz Shiekh · Formula CONC-SONO-001 v1.0.0 · Internal QA complete · Planning only — not a supplier quote
CONC-SONO-001v1.0.0Enter field measurements. Imperial lengths take feet and inches. Unit conversion happens before the reviewed formula is applied.
Calculated result
Ready-mix order
CONC-SONO-001π × (diameter ÷ 2)² × height × count ÷ 27 × (1 + waste) → ready-mix order
Net volume
Counts round up. A cubic yard is 45 of 80 lb, 60 of 60 lb, 72 of 50 lb, 90 of 40 lb.
| Bag | Count |
|---|---|
| 40 lb | 47 |
| 50 lb | 37 |
| 60 lb | 31 |
| 80 lb | 24 |
Sonotube calculator publishes formula CONC-SONO-001 version 1.0.0. Sonotube calculator for solid cardboard-tube volume, ready-mix order and bags. Waste, rounding and the rate you type stay on the sheet so a quote letter can still explain the number. Add the line to an estimate. Planning takeoff only — not a code approval and not a live supplier price.
No dummy crew rates. Totals stay at zero until you type a material or labour rate. Pick a currency — badges, inputs, and totals follow.
Costs use the unit rate you type. Construclytic does not connect to a supplier API. Indicative 2026 US ready-mix often lands around $125–165 per cubic yard delivered; place-and-finish commonly $2–4 per square foot. Replace every rate with a plant or crew quote before you send the letter. Qatar and GCC planning: switch the currency control to QAR, AED, SAR, KWD, OMR or BHD. Construclytic does not publish a live Gulf plant or labour index. Plant, block and crew rates in Doha, Dubai and Riyadh vary by plant and season — replace every number with a local quote.
How this calculator works
Each tube is a solid cylinder: π × (diameter ÷ 2)² × height × count. Ready-mix rounds to the next 0.25 yd³ after waste. The post is not subtracted.
CONC-SONO-001 is a solid cardboard-tube cylinder. The post is not subtracted. Post-hole is the annulus tool when a wood post occupies the hole. Mixing the two formulas shorts the truck. Ready-mix still rounds to the next 0.25 yd³ after waste.
Need the broader workflow? Read the concrete planning guide.
Questions
Post-hole subtracts the post. A sonotube pier is usually poured solid. Mixing the two formulas short the truck.
No. Diameter, depth and steel come from the approved design.
This sonotube calculator publishes formula CONC-SONO-001, version 1.0.0. The ID stays on the result and on the estimate line.
No. The sonotube calculator is a planning takeoff. Construclytic is not a registered engineering or contracting firm. Field checks, codes and product data still sit with you.
No. Costs on the sonotube calculator use the rate you enter. Construclytic does not fetch live supplier prices.