Concrete calculator

Curb and gutter calculator

a 40 ft run with a 6×6 in curb head and an 18×6 in gutter pan is 40 ft³ of net concrete. With 8% waste this tool rounds the ready-mix order to 1.75 yd³. The same default inputs in metric give 1.3 m³.

Formula. V = length × (curb height × curb width + gutter width × gutter thickness) × (1 + waste) → ready-mix order

Combined curb-and-gutter volume, ready-mix order and bag equivalent from run length and the two cross-section rectangles.

By Feroz Sheikh · Our math isn't hidden: see the formula, waste allowance and rounding rule. Formula CONC-CRB-001 v1.1.0

Math shown

See the formula, waste and rounding.

Formula IDCONC-CRB-001v1.1.0

Project inputs

Enter your measurements. Switching units converts the same project, including coverage and unit rates. Package yields keep the unit printed beside each field.

Refine measurements and rates at any time. Your current values are included in the material-list PDF.

Calculated result

1.75yd³

Ready-mix order

Formula, waste and rounding are shownCONC-CRB-001

V = length × (curb height × curb width + gutter width × gutter thickness) × (1 + waste) → ready-mix order

40 ft³

Net volume

1.48 yd³

Net volume

Planning estimate, not engineering advice. Confirm site measurements and product specifications. Calculation limits.

Bag table · waste in

Counts round up. A cubic yard is 45 of 80 lb, 60 of 60 lb, 72 of 50 lb, 90 of 40 lb.

BagCount
40 lb144
50 lb116
60 lb96
80 lb72
Curb and gutter: measurement diagram. Separate the curb and gutter cross-sections, then apply the common run length.
Separate the curb and gutter cross-sections, then apply the common run length. View image

Use run length plus the curb head and gutter pan rectangles to estimate combined curb-and-gutter volume, then apply a visible waste allowance before ready-mix rounding.

  1. Measure the pour length along the face of curb.
  2. Enter curb head and gutter pan as two rectangles — this is not a full battered-curb section.
  3. Use the rounded ready-mix quantity as the starting point for a plant quote.

Add your project costs

Enter supplier prices and any labour, equipment or delivery costs. Pick a currency — badges, inputs, and totals follow.

Enter your supplier’s ready-mix concrete rate in the selected unit. Add delivery, pumping, short-load fees and placing labour as separate project costs. For GCC projects, select QAR, AED, SAR, KWD, OMR or BHD and enter local supplier rates.

View estimate Quote / invoice Add another item

How this calculator works

A transparent curb and gutter takeoff.

Use run length plus the curb head and gutter pan rectangles to estimate combined curb-and-gutter volume, then apply a visible waste allowance before ready-mix rounding.

CONC-CRB-001 is run length times the selected curb-and-gutter cross-section, then ready-mix rounding. It is a prism, not a DOT detail. Transitions, ramps and islands are extra shapes.

Worked example. Example: a 40 ft run with a 6×6 in curb head and an 18×6 in gutter pan is 40 ft³ of net concrete. With 8% waste this tool rounds the ready-mix order to 1.75 yd³.
See the example inputs and calculated result

This separate example uses the calculator's starting values in imperial units. It stays unchanged when you edit the tool above. Example rates, yields and dimensions are assumptions, not recommendations for your project.

Curb and gutter: example inputs
InputExample value
Run length40 ft
Curb height6 in
Curb width6 in
Gutter width18 in
Gutter thickness6 in
Waste factor8 %

Example result: Ready-mix order — 1.75 yd³.

V = length × (curb height × curb width + gutter width × gutter thickness) × (1 + waste) → ready-mix order

Use the labelled units above when reproducing this example. To work in metric, switch the calculator to Metric; applicable measurements are converted, while product-specific units remain labelled.

  1. 1. Measure the pour length along the face of curb.
  2. 2. Enter curb head and gutter pan as two rectangles — this is not a full battered-curb section.
  3. 3. Use the rounded ready-mix quantity as the starting point for a plant quote.

Field notes that change the number

  • Enter the combined section you will pour, not a wall thickness.
  • Flares and catch-basin returns are extra rectangles.
  • Rebar and dowels stay companion lines.

Common mistakes

  • Using a slab thickness on a curb section.
  • Ignoring driveway cuts as extra volume.
  • Calling this a drainage design.

Need the broader workflow? Read the concrete planning guide.

How-to: Curb and gutter concrete: calculate the cross-section first

Questions

Questions about curb and gutter

Is this a standard curb section?

No. It is two rectangles. Battered faces, spillways and island noses need their own takeoff.

Does this replace a civil detail?

No. Confirm the city or engineer section, reinforcement and jointing before you order.

What is the formula ID?

This curb and gutter calculator publishes formula CONC-CRB-001, version 1.1.0. The ID stays on the result and on the estimate line.