Concrete quantity · Published · Updated

How much concrete for a 10×10 slab?

A 10 ft × 10 ft slab at 4 in thick needs 100 × (4/12) = 33.3 ft³ = 1.23 yd³, and with an 8% waste allowance the ready-mix order is 1.50 yd³. Exactly, 100 × (4/12) = 100/3 ft³ = 33.333… ft³ and 100/81 yd³ = 1.234567… yd³, which is 0.9438948864 m³. The same 8% allowance is 36 ft³: 60 bags at 0.60 ft³, 80 bags at 0.45 ft³, or 120 bags at 0.30 ft³. Those yields are the approximate figures on the QUIKRETE Concrete Mix No. 1101 data sheet. Open the concrete slab calculator for this pad. Other shapes are in how to calculate a concrete slab. Mesh sheets, when the drawing specifies them, are in BRC mesh sheets and weight per slab. A 3 m × 3 m slab at 100 mm is a different pour, on the Arabic page.

On this pageAnswerVolume by thicknessBag counts from the published yieldWhen to order ready-mix instead of bagsBase and gravel are not inside the yardsRebar and mesh are a separate count

10 ft × 10 ft × 4 in, then 8% once

Area is 10 × 10 = 100 ft². Four inches is 4/12 of a foot, so the net volume is 100 × (4/12) = 100/3 ft³ = 33.333… ft³. Divide by 27: 100/81 yd³ = 1.234567… yd³, which rounds to 1.23 yd³ at two decimal places and to 1.2346 yd³ at four. One cubic foot is 0.3048³ = 0.028316846592 m³, so the same pour is (100/3) × 0.028316846592 = 0.9438948864 m³. The calculator's waste field defaults to 8%. Applied once, (100/3) × 1.08 = 36 ft³ = 1.333… yd³, which rounds up to a 1.50 yd³ ready-mix order on a 0.25 yd³ step. At the QUIKRETE yields, 36 / 0.60 = 60 bags, 36 / 0.45 = 80 bags and 36 / 0.30 = 120 bags.

Updated · QUIKRETE Concrete Mix No. 1101 data sheet, revised October 2022 — approximate yields 0.30, 0.45 and 0.60 ft³

Concrete slab: measurement diagram. Measure each dimension in the unit shown beside its input. Thickness is separate from plan dimensions.
Measure each dimension in the unit shown beside its input. Thickness is separate from plan dimensions. View image

Volume by thickness

ft³ = length × width × (thickness in inches ÷ 12). yd³ = ft³ ÷ 27. m³ = ft³ × 0.028316846592. For this 10 ft square, ft³ = 100 × (inches ÷ 12). The foot-to-metre factor 0.3048 is exact, so the cubic-foot factor 0.028316846592 is exact too. The table below is the net pour, before any waste allowance. Cubic feet and cubic yards are shown to four decimal places; the cubic metres terminate.

At 4 in, 1 yd³ covers 27 ÷ (4/12) = 81 ft². Sakrete states that check on its bag-estimating page: a cubic yard placed 4 in deep covers 81 square feet. Dividing this 100 ft² pad by 81 returns the same 100/81 yd³. Do not use that shortcut for 5 in or 6 in.

10 ft × 10 ft slab, net volume before waste. ft³ and yd³ are rounded half up to four decimal places. m³ is exact.
Thicknessft³yd³m³80 lb bags60 lb bags40 lb bags
4 in33.33331.23460.94389488645675112
5 in41.66671.54321.1798686087093139
6 in501.85191.415842329684112167

Bag counts from the published yield

Bags = ceil(ft³ ÷ yield). The yield is the figure on the bag, in cubic feet. QUIKRETE Concrete Mix No. 1101, data sheet revised October 2022, prints an approximate yield of 0.30 ft³ (8.5 L) for a 40 lb bag, 0.45 ft³ (12.7 L) for a 60 lb bag and 0.60 ft³ (17 L) for an 80 lb bag. Sakrete's estimating page says 45 bags of 80 lb mix equal one cubic yard, which is 27 ÷ 0.60 = 45, and it is the same 0.60 ft³ yield. These are product-specific approximate yields. Another 80 lb bag can print a different number.

The net 4 in count is ceil((100/3) ÷ 0.60) = 56 bags, ceil((100/3) ÷ 0.45) = 75 bags and ceil((100/3) ÷ 0.30) = 112 bags. With the 8% allowance applied once, the volume is an exact 36, 45 or 54 ft³ and every bag count divides evenly, so the order does not round up a second time. Bag counts are an alternative to the ready-mix order. Adding both buys the pour twice.

Same slab after one 8% allowance. Ready-mix then rounds up to the next 0.25 yd³. The 6 in order is already 2.00 yd³.
Thicknessft³ with 8%Ready-mix order, yd³80 lb bags60 lb bags40 lb bags
4 in361.506080120
5 in451.7575100150
6 in542.0090120180

When to order ready-mix instead of bags

Sixty 80 lb bags is the 4 in pour with 8% waste. That is a large hand mix: the QUIKRETE sheet allows about 6 to 9 pt of water per 80 lb bag and says to keep the placement continuous so the slab does not get a cold joint. A ready-mix order for the same allowance is 1.50 yd³. Whether the truck is the practical choice depends on access, the plant's minimum load and any short-load charge. This page does not state a universal minimum, because the sheet and the Sakrete page do not print one.

Compare the two supply methods on ready-mix or bags, using one waste-adjusted volume. Enter a dated plant price on the concrete cost calculator only after you have the quote. A low bag price does not include mixing time, a mixer, or the truck's short-load fee.

Base and gravel are not inside the yards

The QUIKRETE sheet, under surface preparation, says to remove sod or soil to the desired depth, set the forms, and tamp and compact the sub-base until firm. Before the pour it says to dampen the sub-grade and not leave standing water. It does not publish a gravel thickness. A gravel or crushed-stone layer is a separate volume. Do not add it to the concrete order, and do not omit concrete that will fill a low spot in the subgrade.

Measure that layer on its own, in the gravel calculator, from the thickness you are actually placing. Compaction can make the loose delivered volume different from the in-place thickness. The 8% concrete allowance is not a gravel allowance.

Rebar and mesh are a separate count

This quantity is concrete only. It does not choose bar size, spacing, cover or mesh. If the drawing specifies welded-wire sheets, count them in BRC mesh sheets and weight per slab and on the wire mesh calculator. A bar grid, once the schedule exists, is the rebar calculator.

The measurement order for a rectangle, circle or L-shape, including thickened edges counted only for the extra depth, is how to calculate a concrete slab. A 12 × 12 ft patio at the same 4 in thickness is a larger pad in concrete for a 12 × 12 patio.

Do it in order

  1. Measure the inside of the forms. Keep length and width in feet and thickness in inches.
  2. Multiply length × width × (inches ÷ 12) for cubic feet, divide by 27 for cubic yards, and multiply cubic feet by 0.028316846592 for cubic metres.
  3. Apply one waste allowance, then round ready-mix up to the supplier's increment, or divide the same cubic feet by the bag yield and round up to whole bags.

Planning boundary

This is a quantity for a uniform rectangle. It does not set thickness, compressive strength, joint spacing, reinforcement, base design or a plant price. Confirm the section with the responsible professional and the yield with the bag in your hand.

Sources checked

Each link supports the point named in the text. A citation is not a product endorsement or a price for your site.

  1. QUIKRETE Concrete Mix No. 1101 data sheet, revised October 2022 — approximate yields 0.30, 0.45 and 0.60 ft³
  2. Sakrete: estimating bagged concrete jobs — 45 bags of 80 lb mix per cubic yard, and 81 ft² per cubic yard at 4 in
  3. NIST SP 811: SI unit conversions, including the exact 0.3048 m foot
How much concrete for a 10x10 slab?

A 10 ft × 10 ft slab at 4 in thick is 100 × (4/12) = 33.333… ft³ = 1.234567… yd³, shown as 33.3 ft³ = 1.23 yd³. With an 8% waste allowance the ready-mix order is 1.50 yd³.

How many bags of concrete for a 10x10 slab?

At 4 in, before waste, that is 56 bags at 0.60 ft³ (80 lb), 75 bags at 0.45 ft³ (60 lb), or 112 bags at 0.30 ft³ (40 lb). With 8% waste the counts are 60, 80 and 120. Those yields are the approximate figures on the QUIKRETE Concrete Mix No. 1101 data sheet. Do not add the bag count to the ready-mix order.

How many 80 lb bags of concrete for a 10x10 slab?

56 bags before waste, or 60 bags with the 8% allowance, at 0.60 ft³ per 80 lb bag. At 5 in with that allowance the count is 75 bags. At 6 in it is 90 bags.

Will 1.5 yards cover a 10x10 slab?

For a uniform 4 in slab, 1.50 yd³ is the order after 8% waste and a 0.25 yd³ step. The net volume is 1.234567… yd³. 1.50 yd³ does not cover a thicker slab, a thickened edge, or a waste allowance above 8%.

How much concrete for a 10x10 slab at 6 inches?

A uniform 6 in slab is 50 ft³ = 1.851851… yd³ = 1.4158423296 m³. With 8% waste that is 54 ft³, and the ready-mix order is 2.00 yd³. The bag counts at that allowance are 90, 120 and 180 for the 80 lb, 60 lb and 40 lb yields above.

Should I order ready-mix or bags for a 10x10 slab?

The 4 in pour with 8% waste is 60 bags of 80 lb mix, or 1.50 yd³ of ready-mix. Ask the plant for its minimum load and short-load charge before treating the truck as the cheaper option. This page does not choose from a price that was not quoted.

Does the 10x10 quantity include gravel and rebar?

No. The cubic yards are the concrete inside the forms. The QUIKRETE sheet says to compact the sub-base and dampen it, and it does not publish a gravel thickness. Mesh or rebar is a separate takeoff from the drawing.