Calculated result
Truck loads
LND-DUMP-001loads = ceil(volume × (1 + load factor) ÷ truck capacity)
Haul volume
Volume including load factor
Stated capacity
Landscaping calculator
12 yd³ in a 10 yd³ truck with 10% load factor rounds to 2 loads. In metric, haul volume is 9.17 m³.
Formula. loads = ceil(volume × (1 + load factor) ÷ truck capacity)
Whole dump-truck loads from a stated material volume and truck capacity.
By Feroz Sheikh · Formula LND-DUMP-001 v1.0.0 · Tested formula
LND-DUMP-001v1.0.0Enter your measurements. Switching units converts the same project, including coverage and unit rates. Package yields keep the unit printed beside each field.
Calculated result
Truck loads
LND-DUMP-001loads = ceil(volume × (1 + load factor) ÷ truck capacity)
Haul volume
Volume including load factor
Stated capacity
Planning estimate, not engineering advice. Confirm site measurements and product specifications. Calculation limits.

Whole loads equal the haul volume times a load factor, divided by the stated truck capacity, rounded up.
Enter supplier prices and any labour, equipment or delivery costs. Pick a currency — badges, inputs, and totals follow.
Costs use the bulk-yard, bag or truck-load rate you type. Construclytic does not fetch quarry or nursery prices. Delivery, fabric and edging stay separate lines.
How this calculator works
Whole loads equal the haul volume times a load factor, divided by the stated truck capacity, rounded up.
LND-DUMP-001 is whole truck loads: ceil(volume × load factor ÷ the box you hired). 10 yards is not a universal truck. Cut-and-fill, gravel and trench yards stay companion takeoffs so you do not invent a second volume on this page.
The 143 m³ loose example, and why 12 m³ is only an assumption, is in villa excavation and backfill. Leave the load-factor field at 0 when the volume you typed is already loose.
This separate example uses the calculator's starting values in imperial units. It stays unchanged when you edit the tool above. Example rates, yields and dimensions are assumptions, not recommendations for your project.
| Input | Example value |
|---|---|
| Material volume | 12 yd³ |
| Truck capacity | 10 yd³ |
| Load factor | 10 % |
Example result: Truck loads — 2 loads.
loads = ceil(volume × (1 + load factor) ÷ truck capacity)
Use the labelled units above when reproducing this example. To work in metric, switch the calculator to Metric; applicable measurements are converted, while product-specific units remain labelled.
Need the broader workflow? Read the landscaping planning guide.
How-to: Unit weight of concrete: kilograms, tonnes and US tons · Trench excavation volume: in-place geometry versus loose haulage · Cut and fill balance: why equal cubic metres may not cancel · Dump truck loads: match volume, material condition and usable capacity · Compare aggregate quotes per tonne and per cubic metre · How to order mulch by the yard
Questions
No. Single-axle, tandem and tri-axle boxes differ. Enter the truck you hired.
Match the volume unit to the capacity unit. Mixing bank yards with a loose box under-counts loads.
This dump truck calculator publishes formula LND-DUMP-001, version 1.0.0. The ID stays on the result and on the estimate line.