Default example (50 ft pad length, 20 ft pad width, 6 in average cut depth, 4 in average fill depth, 10% swell / shrinkage): Net export is 6.8 yd³. In metric, pad area is 92.9 m².

Formula. cut = L × W × cut depth ÷ 27; fill = L × W × fill depth ÷ 27; net = cut − fill

Cut volume, fill volume and net import or export from pad length, width and depths. Not a grading design.

By Feroz Sheikh · Our math isn't hidden: see the formula, waste allowance and rounding rule. Formula LND-CUTFILL-001 v1.0.0

Math shown

See the formula, waste and rounding.

Formula IDLND-CUTFILL-001v1.0.0

Project inputs

Enter your measurements. Switching units converts the same project, including coverage and unit rates. Package yields keep the unit printed beside each field.

Refine measurements and rates at any time. Your current values are included in the material-list PDF.

Calculated result

6.8yd³

Net export

Formula, waste and rounding are shownLND-CUTFILL-001

cut = L × W × cut depth ÷ 27; fill = L × W × fill depth ÷ 27; net = cut − fill

20.4 yd³

Cut volume

13.6 yd³

Fill volume

1000 ft²

Pad area

Planning estimate, not engineering advice. Confirm site measurements and product specifications. Calculation limits.

Cut and fill: measurement diagram. Treat average cut and fill depths separately. Haul quantities need verified swell and compaction factors.
Treat average cut and fill depths separately. Haul quantities need verified swell and compaction factors. View image

Cut and fill volumes are length × width × each depth. Net export is cut minus fill; net import is fill minus cut. Swell lives in the waste field.

  1. Use average depths from the grading sketch. Split wild sites into more than one pad.
  2. Export and import are different truck tickets. Do not net them away if they happen on different days.
  3. Dump-truck loads are a companion tool.

Add your project costs

Enter supplier prices and any labour, equipment or delivery costs. Pick a currency — badges, inputs, and totals follow.

Costs use the bulk-yard, bag or truck-load rate you type. Construclytic does not fetch quarry or nursery prices. Delivery, fabric and edging stay separate lines.

View estimate Quote / invoice Add another item

How this calculator works

A transparent cut and fill takeoff.

Cut and fill volumes are length × width × each depth. Net export is cut minus fill; net import is fill minus cut. Swell lives in the waste field.

LND-CUTFILL-001 is a rectangle with two average depths: cut volume, fill volume, and a net export or import. It is not a grading design. Swell and shrinkage live in the waste field so a bank yard is not ordered as a loose yard by accident.

A villa dig is not this pad

Bank, loose and compacted cubic metres for an example villa footprint are in villa excavation and backfill. This tool stays a rectangle with two average depths.

Worked example. Example: a 50 × 20 ft pad cut 6 in and filled 4 in is about 18.5 yd³ cut and 12.3 yd³ fill, so a net export around 6.2 yd³ before swell.
See the example inputs and calculated result

This separate example uses the calculator's starting values in imperial units. It stays unchanged when you edit the tool above. Example rates, yields and dimensions are assumptions, not recommendations for your project.

Cut and fill: example inputs
InputExample value
Pad length50 ft
Pad width20 ft
Average cut depth6 in
Average fill depth4 in
Swell / shrinkage10 %

Example result: Net export — 6.8 yd³.

cut = L × W × cut depth ÷ 27; fill = L × W × fill depth ÷ 27; net = cut − fill

Use the labelled units above when reproducing this example. To work in metric, switch the calculator to Metric; applicable measurements are converted, while product-specific units remain labelled.

  1. 1. Use average depths from the grading sketch. Split wild sites into more than one pad.
  2. 2. Export and import are different truck tickets. Do not net them away if they happen on different days.
  3. 3. Dump-truck loads are a companion tool.

Field notes that change the number

  • Use average depths from the grading sketch. Split wild sites into more than one pad.
  • Export and import are different truck tickets if they happen on different days.
  • Dump-truck loads are a companion tool — do not guess a second volume there.

Common mistakes

  • Netting cut and fill that leave the site on different days.
  • Using this rectangle as a contour or retaining design.
  • Mixing bank yards with a loose truck box.

In Doha and the wider GCC, plants sell cubic metres. Switch the calculator to metric rather than converting a US ticket in your head.

Need the broader workflow? Read the landscaping planning guide.

How-to: Cut and fill balance: why equal cubic metres may not cancel · Dump truck loads: match volume, material condition and usable capacity

Questions

Questions about cut and fill

Is this a grading design?

No. It is a rectangle with two depths. Contours, benches and retaining stay with the civil set.

Bank or loose yards?

The waste field is where swell and shrinkage live. Replace it with the pit factor you were given.

What is the formula ID?

This cut and fill calculator publishes formula LND-CUTFILL-001, version 1.0.0. The ID stays on the result and on the estimate line.