Calculated result
River rock order
LND-RRK-001L × W × D ÷ 27 × (1 + waste)
Net volume
Estimated weight
Area
Landscaping calculator
a 20 × 8 ft bed at 3 in depth, 1.35 t/yd³ and 10% waste rounds to 1.7 yd³, about 2.3 tons. In metric, net volume is 1.13 m³.
Formula. L × W × D ÷ 27 × (1 + waste)
Decorative river-rock volume and tonnage from bed area, installed depth and supplier density.
By Feroz Sheikh · Our math isn't hidden: see the formula, waste allowance and rounding rule.
See the formula, waste and rounding.
LND-RRK-001v1.0.0Enter your measurements. Switching units converts the same project, including coverage and unit rates. Package yields keep the unit printed beside each field.
Calculated result
River rock order
LND-RRK-001L × W × D ÷ 27 × (1 + waste)
Net volume
Estimated weight
Area
Planning estimate, not engineering advice. Confirm site measurements and product specifications. Calculation limits.

Bed length times width times installed depth, plus a visible settling allowance, rounded to the next 0.1 yd³ and converted to tons at the density you enter.
Enter supplier prices and any labour, equipment or delivery costs. Pick a currency — badges, inputs, and totals follow.
Costs use the bulk-yard, bag or truck-load rate you type. Construclytic does not fetch quarry or nursery prices. Delivery, fabric and edging stay separate lines.
How this calculator works
Bed length times width times installed depth, plus a visible settling allowance, rounded to the next 0.1 yd³ and converted to tons at the density you enter.
LND-RRK-001 is bed area × installed depth × an editable density, then a supplier increment. Decorative cobble and compacted base do not share that density. Fabric stays off this tonnage line.
This separate example uses the calculator's starting values in imperial units. It stays unchanged when you edit the tool above. Example rates, yields and dimensions are assumptions, not recommendations for your project.
| Input | Example value |
|---|---|
| Bed length | 20 ft |
| Bed width | 8 ft |
| Installed depth | 3 in |
| Density | 1.35 US tons / yd³ |
| Waste factor | 10 % |
Example result: River rock order — 1.7 yd³.
L × W × D ÷ 27 × (1 + waste)
Use the labelled units above when reproducing this example. To work in metric, switch the calculator to Metric; applicable measurements are converted, while product-specific units remain labelled.
Need the broader workflow? Read the landscaping planning guide.
How-to: Landscape fabric rolls: plan overlaps without adding them twice
Questions
Same volume math, different default depth and density, and a page that matches how people search for river rock.
Landscape fabric is a separate roll takeoff. This tool is the stone only.
This river rock calculator publishes formula LND-RRK-001, version 1.0.0. The ID stays on the result and on the estimate line.