Calculated result
Fill dirt order
LND-FIL-001L × W × D ÷ 27 × (1 + waste)
Net volume
Estimated weight
Area
Landscaping calculator
a 20 × 12 ft pad 12 in deep, 1.2 t/yd³ and 20% swell rounds to 10.7 yd³, about 12.8 tons. In metric, net volume is 6.8 m³.
Formula. L × W × D ÷ 27 × (1 + waste)
Fill-dirt volume and tonnage from area and compacted depth, with swell sitting in the waste field.
By Feroz Sheikh · Our math isn't hidden: see the formula, waste allowance and rounding rule.
See the formula, waste and rounding.
LND-FIL-001v1.0.0Enter your measurements. Switching units converts the same project, including coverage and unit rates. Package yields keep the unit printed beside each field.
Calculated result
Fill dirt order
LND-FIL-001L × W × D ÷ 27 × (1 + waste)
Net volume
Estimated weight
Area
Planning estimate, not engineering advice. Confirm site measurements and product specifications. Calculation limits.

Area times compacted depth, plus a visible swell so the compacted thickness lands, rounded to the next 0.1 yd³ and converted to tons at the density you enter.
Enter supplier prices and any labour, equipment or delivery costs. Pick a currency — badges, inputs, and totals follow.
Costs use the bulk-yard, bag or truck-load rate you type. Construclytic does not fetch quarry or nursery prices. Delivery, fabric and edging stay separate lines.
How this calculator works
Area times compacted depth, plus a visible swell so the compacted thickness lands, rounded to the next 0.1 yd³ and converted to tons at the density you enter.
LND-FIL-001 is area × compacted depth, with swell sitting in the waste input, then a supplier increment. Topsoil and structural fill do not share a density. It is not a compaction spec.
This separate example uses the calculator's starting values in imperial units. It stays unchanged when you edit the tool above. Example rates, yields and dimensions are assumptions, not recommendations for your project.
| Input | Example value |
|---|---|
| Area length | 20 ft |
| Area width | 12 ft |
| Compacted depth | 12 in |
| Density | 1.2 US tons / yd³ |
| Swell / waste | 20 % |
Example result: Fill dirt order — 10.7 yd³.
L × W × D ÷ 27 × (1 + waste)
Use the labelled units above when reproducing this example. To work in metric, switch the calculator to Metric; applicable measurements are converted, while product-specific units remain labelled.
In Qatar and the wider GCC, switch to metric and replace density with the local pit ticket.
Need the broader workflow? Read the landscaping planning guide.
How-to: Trench excavation volume: in-place geometry versus loose haulage · Cut and fill balance: why equal cubic metres may not cancel
Questions
No. Use the soil calculator for planting beds. This page is structural or grade fill, with swell in the open.
No. Export and import are separate lines. Pair it with the trench calculator when you are swapping material.
This fill dirt calculator publishes formula LND-FIL-001, version 1.0.0. The ID stays on the result and on the estimate line.