Landscaping calculator

Fill dirt calculator

a 20 × 12 ft pad 12 in deep, 1.2 t/yd³ and 20% swell rounds to 10.7 yd³, about 12.8 tons. In metric, net volume is 6.8 m³.

Formula. L × W × D ÷ 27 × (1 + waste)

Fill-dirt volume and tonnage from area and compacted depth, with swell sitting in the waste field.

By Feroz Sheikh · Our math isn't hidden: see the formula, waste allowance and rounding rule. Formula LND-FIL-001 v1.0.0

Math shown

See the formula, waste and rounding.

Formula IDLND-FIL-001v1.0.0

Project inputs

Enter your measurements. Switching units converts the same project, including coverage and unit rates. Package yields keep the unit printed beside each field.

Refine measurements and rates at any time. Your current values are included in the material-list PDF.

Calculated result

10.7yd³

Fill dirt order

Formula, waste and rounding are shownLND-FIL-001

L × W × D ÷ 27 × (1 + waste)

240 ft³

Net volume

12.84 tons

Estimated weight

240 ft²

Area

Planning estimate, not engineering advice. Confirm site measurements and product specifications. Calculation limits.

Fill dirt: measurement diagram. Measure each dimension in the unit shown beside its input. Thickness is separate from plan dimensions.
Measure each dimension in the unit shown beside its input. Thickness is separate from plan dimensions. View image

Area times compacted depth, plus a visible swell so the compacted thickness lands, rounded to the next 0.1 yd³ and converted to tons at the density you enter.

  1. Measure the area that will receive fill, not the excavation unless they match.
  2. Enter compacted depth. Swell lives in the waste field so a 12 in pad is not ordered as 12 in of loose dirt.
  3. Confirm density with the pit. Topsoil, fill dirt and engineered fill are not the same.

Add your project costs

Enter supplier prices and any labour, equipment or delivery costs. Pick a currency — badges, inputs, and totals follow.

Costs use the bulk-yard, bag or truck-load rate you type. Construclytic does not fetch quarry or nursery prices. Delivery, fabric and edging stay separate lines.

View estimate Quote / invoice Add another item

How this calculator works

A transparent fill dirt takeoff.

Area times compacted depth, plus a visible swell so the compacted thickness lands, rounded to the next 0.1 yd³ and converted to tons at the density you enter.

LND-FIL-001 is area × compacted depth, with swell sitting in the waste input, then a supplier increment. Topsoil and structural fill do not share a density. It is not a compaction spec.

Worked example. Example: a 20 × 12 ft pad 12 in deep, 1.2 t/yd³ and 20% swell rounds to 10.7 yd³, about 12.8 tons.
See the example inputs and calculated result

This separate example uses the calculator's starting values in imperial units. It stays unchanged when you edit the tool above. Example rates, yields and dimensions are assumptions, not recommendations for your project.

Fill dirt: example inputs
InputExample value
Area length20 ft
Area width12 ft
Compacted depth12 in
Density1.2 US tons / yd³
Swell / waste20 %

Example result: Fill dirt order — 10.7 yd³.

L × W × D ÷ 27 × (1 + waste)

Use the labelled units above when reproducing this example. To work in metric, switch the calculator to Metric; applicable measurements are converted, while product-specific units remain labelled.

  1. 1. Measure the area that will receive fill, not the excavation unless they match.
  2. 2. Enter compacted depth. Swell lives in the waste field so a 12 in pad is not ordered as 12 in of loose dirt.
  3. 3. Confirm density with the pit. Topsoil, fill dirt and engineered fill are not the same.

Field notes that change the number

  • Compacted depth is the number that matters for the finished grade.
  • Swell means the truck carries more loose yards than the hole.
  • Replace density with the pit ticket.

Common mistakes

  • Using decorative-soil density on structural fill.
  • Ignoring swell on a haul ticket.
  • Calling this a geotech report.

In Qatar and the wider GCC, switch to metric and replace density with the local pit ticket.

Need the broader workflow? Read the landscaping planning guide.

How-to: Trench excavation volume: in-place geometry versus loose haulage · Cut and fill balance: why equal cubic metres may not cancel

Questions

Questions about fill dirt

Is this topsoil?

No. Use the soil calculator for planting beds. This page is structural or grade fill, with swell in the open.

Does this include haul-off?

No. Export and import are separate lines. Pair it with the trench calculator when you are swapping material.

What is the formula ID?

This fill dirt calculator publishes formula LND-FIL-001, version 1.0.0. The ID stays on the result and on the estimate line.