Exterior calculator

Fascia

Fascia-board sticks from eave plus rake run, rounded to the stock length you will buy.

Reviewed formula · v1.0.0

Project inputs

Enter field measurements. Imperial lengths take feet and inches. Unit conversion happens before the reviewed formula is applied.

run 12rise 66/12 pitch
All values can be refined when you edit the estimate. This tool does not replace field verification or local requirements.

Calculated result

7sticks

Sticks to buy

FormulaEXT-FAS-001

(eave + rake) × (1 + waste) ÷ stock length

100 ft

Eave + rake

110 ft

Run including waste

Transparent cost view

Planning rates only. Pick a currency — badges, inputs, and totals follow. Material is a rate. Labour is hours × a planning hourly rate. Equipment and delivery are this-job amounts.

Planning defaults are office figures, not a bid. US ready-mix in 2026 often lands around $125–165 per cubic yard delivered; place-and-finish commonly $2–4 per square foot. Replace every rate with a supplier or crew quote before you send the letter.

Indicative FX as of Aug 2026. Planning conversion, not a live bank rate.

Material costUSD 595
Labour (8 h)USD 280
Direct costUSD 985
Overhead + contingencyUSD 98.50
Markup + taxUSD 130
Estimated project totalUSD 1,214
View estimate Quote / invoice Add another item

How this calculator works

A transparent fascia takeoff.

Eave plus rake, times a mitre allowance, rounded up to whole sticks of the stock length you will buy.

Worked example. Example: 60 ft of eave plus 40 ft of rake with 10% waste is 110 ft, which rounds to 7 sticks of 16 ft fascia.
  1. 1. Measure eaves and rakes separately. A hip roof may have eaves only.
  2. 2. Buy longer sticks than the longest run when you can, so you splice less in the weather.
  3. 3. Sub-fascia and finish fascia are different lines if the job uses both.

Need the broader workflow? Read the exterior planning guide.

Questions

Questions about fascia

Aluminum wrap or wood?

Length math is the same. Coil stock is often sold by the linear foot of a stated width — keep that as a second line.

Is this drip edge?

No. Drip edge is the metal at the roof edge. Fascia is the vertical board the gutter mounts to.

What is the formula ID?

This calculator publishes formula EXT-FAS-001, version 1.0.0. The ID stays on the result and on the estimate line.

Is this engineering advice?

No. Construclytic is a planning website, not a registered engineering or contracting firm. Field checks, codes and product data still sit with you.

Does Construclytic fetch live supplier prices?

No. Costs use the rate you enter. Construclytic does not fetch live supplier prices.