Calculated result
Bundles to order
ROOF-STR-001eave × (1 + waste) ÷ coverage per bundle
Eave run
Run including waste
Roofing calculator
Starter-shingle bundle count from total eave length and the linear coverage printed on the starter bundle.
Enter field measurements. Imperial lengths take feet and inches. Unit conversion happens before the reviewed formula is applied.
Calculated result
Bundles to order
ROOF-STR-001eave × (1 + waste) ÷ coverage per bundle
Eave run
Run including waste
Planning rates only. Pick a currency — badges, inputs, and totals follow. Material is a rate. Labour is hours × a planning hourly rate. Equipment and delivery are this-job amounts.
Planning defaults are office figures, not a bid. US ready-mix in 2026 often lands around $125–165 per cubic yard delivered; place-and-finish commonly $2–4 per square foot. Replace every rate with a supplier or crew quote before you send the letter.
Indicative FX as of Aug 2026. Planning conversion, not a live bank rate.
How this calculator works
Total eave length times a lap allowance, divided by the linear coverage printed on the starter bundle, rounded up to whole bundles.
Need the broader workflow? Read the roofing planning guide.
Questions
You can, but this takeoff is for purpose-made starter. Leftover 3-tab is a field decision, not a default.
No. Ice-and-water is the self-adhered membrane. Starter is the first course of shingle.
This calculator publishes formula ROOF-STR-001, version 1.0.0. The ID stays on the result and on the estimate line.
No. Construclytic is a planning website, not a registered engineering or contracting firm. Field checks, codes and product data still sit with you.
No. Costs use the rate you enter. Construclytic does not fetch live supplier prices.