Calculated result
Cap bundles to order
ROOF-RIDGE-001(ridge + hips) × (1 + waste) ÷ bundle coverage
Ridge plus hip run
Run including waste
Roofing calculator
a 30 ft ridge plus 40 ft of hips is 70 ft. With 10% waste and 20 ft per bundle, the order rounds to 4 bundles. In metric, ridge plus hip run is 21.34 m.
Formula. (ridge + hips) × (1 + waste) ÷ bundle coverage
Hip and ridge cap bundles from measured ridge and hip length plus the selected bundle's linear coverage.
By Feroz Sheikh · Our math isn't hidden: see the formula, waste allowance and rounding rule.
See the formula, waste and rounding.
ROOF-RIDGE-001v1.0.0Enter your measurements. Switching units converts the same project, including coverage and unit rates. Package yields keep the unit printed beside each field.
Calculated result
Cap bundles to order
ROOF-RIDGE-001(ridge + hips) × (1 + waste) ÷ bundle coverage
Ridge plus hip run
Run including waste
Planning estimate, not engineering advice. Confirm site measurements and product specifications. Calculation limits.

This calculator converts measured ridge and hip length into whole hip-and-ridge bundles using the selected bundle's linear coverage and a visible cut allowance.
Enter supplier prices and any labour, equipment or delivery costs. Pick a currency — badges, inputs, and totals follow.
Costs use the square, bundle or panel rate you type. Construclytic does not fetch shingle or metal prices. Tear-off, dumpsters, starter and flashing stay separate estimate lines. For GCC projects, select QAR, AED, SAR, KWD, OMR or BHD and enter local supplier rates.
How this calculator works
This calculator converts measured ridge and hip length into whole hip-and-ridge bundles using the selected bundle's linear coverage and a visible cut allowance.
ROOF-RIDGE-001 turns ridge plus hip length into whole cap bundles using the linear coverage on the bundle. Shingles on the field are a different count. Formula ID stays so a later estimator can swap the cap product.
This separate example uses the calculator's starting values in imperial units. It stays unchanged when you edit the tool above. Example rates, yields and dimensions are assumptions, not recommendations for your project.
| Input | Example value |
|---|---|
| Ridge length | 30 ft |
| Hip length | 40 ft |
| Coverage per bundle | 20 ft / bundle |
| Waste factor | 10 % |
Example result: Cap bundles to order — 4 bundles.
(ridge + hips) × (1 + waste) ÷ bundle coverage
Use the labelled units above when reproducing this example. To work in metric, switch the calculator to Metric; applicable measurements are converted, while product-specific units remain labelled.
Need the broader workflow? Read the roofing planning guide.
How-to: Hip and ridge cap bundles: count linear coverage, not roof squares · How to estimate roof shingles
Questions
Some roofs use cut-up field shingles. Enter the actual linear coverage you will get from that method; it is not the same as a dedicated cap bundle.
No. Starter, drip edge, flashing and ventilation are separate takeoffs.
This ridge cap calculator publishes formula ROOF-RIDGE-001, version 1.0.0. The ID stays on the result and on the estimate line.