Calculated result
Pieces to order
ROOF-DRP-001(eave + rake) × (1 + waste) ÷ stock length
Eave + rake
Run including waste
Roofing calculator
60 ft of eave plus 40 ft of rake with 10% waste is 110 ft, which rounds to 11 pieces of 10 ft drip edge. In metric, eave + rake is 30.48 m.
Formula. (eave + rake) × (1 + waste) ÷ stock length
Drip-edge piece count from eave run plus rake run, divided by the stock length you will buy.
By Feroz Sheikh · Our math isn't hidden: see the formula, waste allowance and rounding rule.
See the formula, waste and rounding.
ROOF-DRP-001v1.0.0Enter your measurements. Switching units converts the same project, including coverage and unit rates. Package yields keep the unit printed beside each field.
Calculated result
Pieces to order
ROOF-DRP-001(eave + rake) × (1 + waste) ÷ stock length
Eave + rake
Run including waste
Planning estimate, not engineering advice. Confirm site measurements and product specifications. Calculation limits.

Add eave length to rake length, apply a lap allowance, then round up to whole sticks of the stock length you will buy.
Enter supplier prices and any labour, equipment or delivery costs. Pick a currency — badges, inputs, and totals follow.
Costs use the square, bundle or panel rate you type. Construclytic does not fetch shingle or metal prices. Tear-off, dumpsters, starter and flashing stay separate estimate lines. For GCC projects, select QAR, AED, SAR, KWD, OMR or BHD and enter local supplier rates.
How this calculator works
Add eave length to rake length, apply a lap allowance, then round up to whole sticks of the stock length you will buy.
ROOF-DRP-001 counts drip-edge pieces from eave plus rake run, divided by the stock length you will buy. Field flashing and ice-and-water stay extras. Formula ID stays on the order.
This separate example uses the calculator's starting values in imperial units. It stays unchanged when you edit the tool above. Example rates, yields and dimensions are assumptions, not recommendations for your project.
| Input | Example value |
|---|---|
| Eave length | 60 ft |
| Rake length | 40 ft |
| Piece length | 10 ft |
| Waste factor | 10 % |
Example result: Pieces to order — 11 pieces.
(eave + rake) × (1 + waste) ÷ stock length
Use the labelled units above when reproducing this example. To work in metric, switch the calculator to Metric; applicable measurements are converted, while product-specific units remain labelled.
Need the broader workflow? Read the roofing planning guide.
Questions
Drip edge is the eave and rake metal. Step flashing, valleys and wall flashing are different takeoffs — use the flashing calculator for those runs.
Profile is a spec, not this count. Length math is the same.
This drip edge calculator publishes formula ROOF-DRP-001, version 1.0.0. The ID stays on the result and on the estimate line.