Calculated result
Ramp run
LBR-RMP-001run = rise × slope ratio; slope % = 100 ÷ ratio
Slope
Walking surface
Rise
Lumber & framing calculator
Ramp run length and slope percent from total rise and a stated slope ratio. Planning geometry only — not an ADA approval.
Enter field measurements. Imperial lengths take feet and inches. Unit conversion happens before the reviewed formula is applied.
Calculated result
Ramp run
LBR-RMP-001run = rise × slope ratio; slope % = 100 ÷ ratio
Slope
Walking surface
Rise
Planning rates only. Pick a currency — badges, inputs, and totals follow. Material is a rate. Labour is hours × a planning hourly rate. Equipment and delivery are this-job amounts.
Planning defaults are office figures, not a bid. US ready-mix in 2026 often lands around $125–165 per cubic yard delivered; place-and-finish commonly $2–4 per square foot. Replace every rate with a supplier or crew quote before you send the letter.
Indicative FX as of Aug 2026. Planning conversion, not a live bank rate.
How this calculator works
Ramp run equals total rise times the slope ratio (12 for a 1:12 planning slope). Slope percent is 100 ÷ ratio. This is geometry for a material and landing sketch, not an accessibility approval.
Need the broader workflow? Read the lumber & framing planning guide.
Questions
No. Construclytic is not an accessibility inspector. 1:12 and 36 in width are common planning figures. Confirm the applicable standard, landings and handrails before you build.
A long run may need a landing every 30 ft of run under common rules. Split the rise and add landing area as its own line.
This calculator publishes formula LBR-RMP-001, version 1.0.0. The ID stays on the result and on the estimate line.
No. Construclytic is a planning website, not a registered engineering or contracting firm. Field checks, codes and product data still sit with you.
No. Costs use the rate you enter. Construclytic does not fetch live supplier prices.