CONSTRUCLYTIC | READY-MIX SUPPLIER QUOTE CHECKLIST Original worksheet, 28 September 2026 https://construclytic.com/guides/gcc/concrete-price-per-m3-qatar PROJECT AND POUR Project / site address: Site contact and phone: Drawing revision / date: Approved concrete mix reference and requirements: Testing / sampling requirements: Requested pour date and time window: Truck access / pump reach / site constraints: QUANTITY Net measured volume (m3): Chosen allowance (% and reason): Requested total (m3): Supplier order increment / rounded order (m3): Truck capacity / truck spacing: SUPPLIER OFFER Supplier and contact: Quote number / date / validity: Currency: Concrete rate per m3: Delivery included? If not, charge: Minimum-load / short-load charge: Pump mobilisation / minimum attendance: Pumping rate / included time / extra-hour rate: Waiting-time allowance and rate: Hot-weather arrangements and charges: After-hours / night-pour charges: Taxes, if applicable: Total for the same agreed scope: Payment terms: Exclusions: Cancellation or rescheduling conditions: Unused concrete / washout / return conditions: BEFORE CONFIRMING [ ] All offers use the same specification and quantity. [ ] Delivery is counted once. [ ] Pump scope and access are confirmed. [ ] Mix reference and testing requirements are agreed. [ ] Date, time, truck spacing and delay contacts are agreed. [ ] Quote validity and exclusions are checked. [ ] Order volume has the agreed purchase rounding. [ ] Delivered volume and mix will be checked against tickets. Quantity and quote-comparison worksheet; use the approved project specification.